Contaminated Land Investigations

Just like any asbestos removal job, the key to contaminated land work is to remove the asbestos from the site while controlling airborne fibres and preventing cross-contamination of adjacent areas. This is simply done on a larger scale and without the benefit of negative pressure or a controlled environment. Fortunately, the environment is far from an enclosed space and airborne fibre levels are easily diluted in the atmosphere.

Dust suppression technique during excavation and loading of contaminated material. Note reusable nylon overalls and spray nozzle to bowser.

The Role Of The Site Analyst
The site analyst is essential to works. He is involved in the process of identifying the problem during trial excavations and core sampling, helps set up the site system of clean and dirty areas and then effectively controls excavation at the dig. He visually identifies contaminated material and designates waste as clean, dirty or Special Waste. He conducts perimeter and personal air tests to reassure site staff and the public. He inducts people coming onto the site to ensure they operate within site rules. He checks all machinery leaving the site for contamination and is ultimately responsible for declaring the site clear at the end, supported by bulk sampling. It his duty to direct dust suppression efforts and call a halt to works in the events of strong winds excessive visible dust generation or other undesirable events.

Levels Of Contamination – Types Of Waste

There are 3 levels of contamination

1) General Waste. No asbestos material is detected visually or by analysis in the soil / rubble concerned.

2) Soil / Rubble contaminated with asbestos. Generally only asbestos cement will be accepted in this category as other varieties can break down so as to prevent a visual assessment. Asbestos content by mass is >0% <0.1%. Note this is asbestos content, not asbestos containing material (for example, asbestos cement could have as little as 5% asbestos content. A number of ‘normal’ landfill sites can accept this material but will not accept Special Waste. This is less expensive to be disposed of than Special Waste.

3) Special Waste. >0.1% asbestos content by mass. Requires section 62 (Special Waste Consignment Note) from the Environment Agency and disposal at a Special Waste Licensed tip. This is now very expensive as the number of facilities has been vastly reduced. The client must retain the bottom copy of the documentation indefinitely when the carrier returns it to him.

If a supervising analyst controls the dig directly, materials excavated can be visually assessed and separated into each form to control the cost of disposal by limiting the amount of material needlessly disposed of as Special Waste. MIS Ltd Environmental has carried out this process on a number of occasions.

Controlling Transmigration Of Asbestos

As mentioned above, asbestos can contaminate nearby areas, workers and members of the public in two ways

1) Airborne fibre release- asbestos dust being released and blown off-site.
2) Cross-contamination- asbestos containing materials being carried off site on workers boots, clothes, or transport.

Typical brownfield material- Special Waste- asbestos cement sheeting
Asbestos fire blankets from chrysotile (bottom) and amosite (top) with crocidolite stuffing (bottom left) and crocidolite rope.
Amosite fire blanket stuffed with pure crocidolite- came from the area below
Using this technique, even when excavating such friable materials, airborne fibre levels at the perimeter and on the site operatives were never recorded above the limit of detection.
Prevention of these forms of transmigration can be achieved using simple, common sense systems:
1) Airborne Fibre release- using a water bowser and fine spray nozzle, a mist of water or water pva mix can be drifted over the material during excavation, lifting and deposition on the wagon or dumper (this is a fine balance between over-weighting the material effecting tipping costs and dust suppression. Some training and experience will be required by the site operative involved but this takes a fairly short time to perfect. See photographs for this system in action at Paradise Tip, Witton Park, an 8 month long contract for One Northeast.

A mist spray or spray curtain can also be employed to down any airborne dust which positioned correctly. Any haul roads or areas of the site where contaminated machines are like to raise dust must be sprayed with a bowser to prevent any visible dust release. Airborne dust blowing across site is the most likely source of complaints from members of the public- they cannot tell whether it is asbestos or not so its suppression must be regarded as essential.

To measure the effectiveness of these measures, the site analyst carries out continual long-term background monitoring at established sampling points on the site’s perimeter fence and personal monitoring on himself, plant operatives and any banksmen / spray operators.
2) Cross-migration- Control is achieved by fencing the site into Dirty (contaminated and work area) and Clean (parking, office and public access) areas and directing all access and egress between the two via a decontamination unit (people) and Wheel-washing facility (vehicles). A specialised metal trough with numerous nozzles to either side can be acquired for wagons to drive through and have wheels and bodies washed off as they pass through it. All site machinery (excavators, dumper trucks etc. remain on the Dirty side of the site until all work is completed. They are then power washed, allowed to drive and then swab tested and have reassurance air testing in their cabs prior to being allowed off site.

All site personnel must wear disposable PPE and suitable P2 or P3 RPE depending on the material being excavated. It is possible to acquire nylon overalls that can be re-used and sent to a specialist laundry for long-term jobs where the cost of disposables will become prohibitive. Regular reassurance air monitoring should be undertaken by the site analyst in the DCU’s clean end to ensure the system is working.

To prevent the work site itself becoming cross-contaminated by vehicles carrying asbestos waste as parts become completed, it is common practice to commence excavation down to clean at the farthest end of the site from the Clean area and work gradually back towards the entry / exit point- vehicles travel only over ‘dirty’ material. Otherwise, haul roads will need to be constructed from hard-core fill either from material crushed on-site or brought in at cost from elsewhere.


Waste Issues

Transport of contaminated / special waste could prove extremely costly and where possible (with the consent of the client and the environment agency) retaining the waste on site (for example inside bunds or banks or under roads) should be investigated as the best environmental option. Remember that the waste will only end up underground anyway and if you can save the damage to the environment by transportation of the material by road as well as the cost of haulage and tipping, then this should be pursued. At the Seaham remediation site MIS saw the installation of contaminated waste beneath new roads being constructed and at Marske in Cleveland asbestos cement was used in the centre of newly constructed earthwork bunds. In all cases, the material must be capped (preferably with clay and some form of high visibility membrane to warn anyone potentially excavating in future) with at least 500mm of neutral material. The position of the waste along with depth and quantity must be carefully documented and the records retained indefinitely by the site owners.

Where waste must be taken off site (and with Special Waste this is usually the case) wagons must be covered (most have a removable cover anyway) and pressure washed after use. They can then be swab tested and verified as clean before commencing other work. The wagon can be sheeted out with polythene to prevent contamination if this is deemed practical based on the material being transported. Whilst on site and at the landfill, wagon drivers must keep windows close and where a disposable mask. Regular personal and reassurance air monitoring should be carried out in random wagons by the site analyst.


Remediation Analyst’s Process In A Nutshell

· Establish asbestos presence (trial pits and sampling)
· Draw up a specification and site plan
· Fence off site (warning signs) and designate clean and dirty areas
· Install DCU and wheel-wash across the barrier between clean and dirty
· Suppress dust release while excavating material.
· Visible dust or winds >20 knots stop work until problem subsides
· Visually identify the type of waste and treat accordingly
· Waste off site via wheel-wash with appropriate documentation
· Excavation works from the back of the site towards the wheel-wash leaving clean material behind
· All machinery jet-washed and tested prior to leaving site
· Final sampling to establish site cleanliness
· Leave site

 

 
 